Aluminum Ceiling Downlights Round Down Light Antiglare Trimless Spotlight Adjustable Recessed Led Downlight For Hotel Project
COB LED Ceiling Light
Aluminum Ceiling Downlights Round Down Light Antiglare Trimless Spotlight Adjustable Recessed Led Downlight For Hotel Project
Voltage:AC 110-240v
Material Science: aluminum
Power:7w 10w 12w 18w
描述
Aluminum Ceiling Downlights Round Down Light Antiglare Trimless Spotlight Adjustable Recessed Led Downlight For Hotel Project
Model:CL0069
Custom Options:
1.Power:7w 10w 12w 18w
2.Custom reflective cup,there are 11 models&colors
3.Color temperature:2600K 2800K 3000K 3200K 3500K 4000K 4500K 5000K 5500K 6000K 6500K 7000K
4.Shape:Round & Square,
Description
Product name:LED Ceiling Downlight
Voltage:AC 110-240v
Material Science: aluminum
Light color: warm white,neutral white,cool white
PF:0.95
CRI:80
Beam angle:15/ 24/ 38 degree
Luminous Flux:100-110lm/w
Size:
7w round: D66*64mm (cut size 55mm)
10w round: D85*71mm (cut size 75mm)
12w round: D85*84mm (cut size 75mm)
18w square: D105*106mm (cut size 95mm)
Advantage:
High temperature paint die casting aluminum lamp body
The surface is made by multiple processes, which has good corrosion resistance, rust-proof and color-free, durable.
High light transmission acrylic lampshade
Matte soft light technology, high light transmittance, soft light for eye protection, feel more comfortable and soft light environment
lamps lanterns
select aviation aluminum
compression wear-resisting, not rusting
the anodic oxidation treatment
long life span
High quality spring buckle
Plastic wrap buckle, safety hand guard during installation, high-quality spring, firm and powerful, not easy to loosen, safe and durable.
其他信息
Color Temperature | Cool White-6000K, Neutral White-4000K, Warm White-3000K |
---|---|
Power | 10w, 12w, 15w, 18w, 7w |
Reflective cup | Black, Gun-Black, White |
SHIPPING
Free Shipping
We offer Free Shipping services within the United Sates,Canada,the Europe,Australia and so on.Usually Goods will be sent by DHL&UPS,sometimes sent by FEDEX,TNT,EMS and so on.
Delivery time
We need some time to produce the mirror based on your request. Delivery time is about 8-10 weeks. We deal with production and delivery on business days.
– Production Time: 3-4 weeks.
– Shipping Time: 3-6 weeks.
※Ps:Products which is greater than 400cm will be delivered with LTL freight service, so delivery time will take 2 weeks longer.
Rush Service
Rush Service takes 5-6 weeks to deliver (Extra Shipping cost: $399)
Self-Pickup Service
It takes about 8-10 weeks for you to get the mirror.
Select your preferred pickup point, and collect the package yourself when it is ready in the warehouse.
Don’t have to wait for the warehouse to book a carrier and wait another several weeks for the package to come.
Secure Payment
When you send sensitive payment information through our website, the information will be encrypted using industry-standard encryption protocols (including SSL certification).